NEWS
Trotec laser. marking cutting graving
Autohaus Köfler & Ernst – Phase 2
Zubau an die Werkstatt und Neubau Büro- und Lagergebäude Beim gegenständlichen Bauvorhaben handelt es sich um die Erweiterung der bestehenden Betriebsanlage mittels Zubau an die im Jahre 2010 ebenfalls von EcoProjekt als Generalunternehmer erbaute Werkstatt. Durch den von EcoProjekt als Generalunternehmer errichteten Umbau entstand eine Neubau-Gesamtwerkstattfläche von ca. 520 m2. Innerhalb des Werkstattluftraumes konnte mittels Einbau […]
Projekt Kosme GmbH, Sollenau
The company KOSME GmbH plans, develops and manufactures machines and complete systems for the areas of filling and packaging engineering. The new factory building consists of a one-storey production hall, an engineering area associated to the production, and a three-storey office area. As a result of the factory extension with the new construction of object […]
Fried v. Neuman Extrusion Plant, Marktl
Topping-out Ceremony and Completion of Contract Section 1 Conversion and Annex Hall 6 As a result of the cooperative interaction between the individual works, it was already possible to complete contract section 1 to such an extent that tool engineering and the storage facility could be moved. The path was thus paved for the […]
Winner of Helios 2014
Georg Fischer GmbH, Herzogenburg. The internationally operating enterprise Georg Fischer Automotive employs more than 700 employees at the site Herzogenburg. These produce and cast aluminium and iron components for cars, service vehicles and industrial applications. A comprehensive modernisation of the plant was carried out in recent years. Energy efficiency considerations were thereby particularly at the […]
U9 – We’re the Champions!
Sponsoring of FCM Juniors. U9 season 2014/15 – champion: a great championship season came to an end. With a consistently good match performance, our U9 juniors were able to finish the season successfully and fetch the title as a result. Congratulations to the magnificent kids and the trainer team! After the summer break, U9 […]
Mondi Korneuburg GmbH
Additional storage and parking facilities. After completion of Phase 1, consisting of the reconstruction of a printing hall and the construction of the building technology centre, a 600m2 storage unit in framing construction on a monolithic foundation with a panel front was built during continuous operation. Additionally a 1600m2 big employee parking space to ease […]
Fried v. Neuman Fließpresswerk, Marktl
Kostenoptimierung nach erfolgter Einreichung für Umbau, Zubau Halle 6. Nach einer vorliegenden Einreichplanung wurde EcoProjekt mit der Überarbeitung des Projektes, der Ausführungsplanung, der Angebotseinholung und der örtlichen Bauaufsicht für die Baugewerke beauftragt. Aufgabenstellung ist, die auf Basis der Einreichung ermittelten Projektkosten durch wirtschaftliche Ausführungsplanung und Überarbeitung des statischen Systems um ca. 20 % zu senken. […]
Projekt Büchler
Projektentwicklung Bürocenter Königstetten. Gemeinsam mit der Firma Büchler in Königstetten (Bezirk Tulln, Niederösterreich) wurde ein Bürocenter mit 2.500m² Nutzfläche entwickelt. EcoProjekt fungiert als technischer Berater und Generalplaner. Das Gebäude ist als Nullenergiehaus mit flexiblen Grundrissen konzipiert. Die zeitlose, moderne Architektur mit hinterleuchteter Fassade wird durch Photovoltaikelemente ergänzt. Growing Green Ideas – Optimale Dämmung […]
Sponsoring the FCM Traiskirchen Juniors
The Youth leadership of FCM Traiskirchen did invite to the Christmas party in the historical Kammgarnsaal in Möllersdorf. After the opening remarks by the representants of the community, the lower Austria football association and the youth leaders, the polo shirts sponsored by EcoProjekt and Kyocera were given to the youth team as Christmas presents. In […]
Philips Complex 1100 Wien, Triester Straße
Repurposing and Redevelopment of the Philips Complex. As Austrias first prestressed concrete building the Philips complex, which was planned and constructed by Mr. Prof. DI Schwanzer between 1962 and 1964, is one of the most important buildings of the postmodern architecture in Vienna. In 2014 it was aquired by a group of investors for repurposing […]
Mondi Korneuburg GmbH – Roto II
Reconstruction of the printing hall and construction of a building technology centre. An already existing storage depot was converted for the installation of a rotary printing press. Therefore it was inevitable to establish a deep foundation for the printing press. Additionally it was necessary modernize the fire sections as well as the heat and smoke […]
Car showroom Köfler & Ernst
Extension of the car workshop as well as additional office and storage buildings. In 2010 EcoProjekt was as the general contractor responsible for the construction of the car workshop which is now extended. Through reconstruction there is additional 520 m2 usable space within the car workshop, including a steel gallery about 80m². The gap between […]
Kwizda Agro
Kwizda Agro. Project description coming soon.
EU GREENBUILDING CERTIFICATE OF TROTEC AND MONDELEZ
Out of 180 national submitted GreenBuilding winner projects of the entire EU in 2013/2014, nine award winners were honoured by the Joint Research Centre of the European Commission. EcoProjekt served as constructional engineer for two projects, Mondelez Österreich GmbH (Kraft Foods) und Trotec Produktions- und Vertriebs GmbH, which were awarded. The operating building of Mondelez, […]
Trial operation by Bioenergie Niederösterreich
Regional heating supply for industrial buildings in Wöllersdorf Bioenergie NÖ reg.Gen.m.b.H. as operator could team up the companies Iveco, Plecher Planen, AKE Knebel & Forster und H.T.B. Handel-Transport-Beteiligungs GesmbH with an underground district heating network to supply these companies eco-friendly and regional with heat in Wöllersdorf. EcoProjekt was assign as general engineer for the design […]
Launch Party of the Zero Energy Building
We thank Trotec for the good collaboration and wish them success in their new operations centre! You will find the video of the launch party here: http://www.lt1.at/tv-berichte/news/16229 You will find more impressions of the launch party: http://www.troteclaser.com/en-US/About-Trotec/News/Pages/2013-10-opening-ceremony-new-headquarters.aspx
Haberfellner Mühle Grieskirchen
Bakery Peter Burger
Autohaus Koller (Mazda)
Industrial Estate Vienna
Schömer
Trotec laser. marking cutting graving
Trotec laser. marking cutting graving
New Production and Distribution Location for Coca-Cola
Since 2009 EcoProjekt has been assisting Coca-Cola Hellenic as constructional engineer and general contractor. Optimisation of the operating logistics and reconstruction in 2009 ensured that the Viennese location, Triesterstrasse, could be preserved for another 4 years. The Viennese location was opened in 1955 and served as Austrian production site for over 50 years. However, the site […]
Trotec – Completion of the Zero-Energy Building
The new energy-self-sufficient operations building of Trotec laser. marking cutting engraving, a subsidiary of Trodat – world leader in self-inking stamps is built to set new standards. The building’s main concept, form and interiors are designed according to Feng Shui to create an ideal work environment for 100 employees. Further the building should be extendable. […]
Construction project management and its contractual forms
Crucial for the smooth execution of engineering, submission, permission and implementation of commercial and industrial building projects is the project management. Construction project management covers the planning, organising and controlling of all people and projects involved, for example, contractee, departments (warehouse, production, sales, administration, security,…), contractors (main and ancillary construction trades), professional and specialised engineers […]
Trotec – Zero-energy Building
Trotec is a subsidiary of Trodat – world leader in the stamp industry – and want to construct their new operational plant with new standards. Their building is designed for energy self-efficiency. Further the building should be extendable. Ecoprojekt speaks of “extendable” when all fittings for the building services are available for extension and additional […]