Mondi Korneuburg GmbH – Roto II
Reconstruction of the printing hall and construction of a building technology centre.
An already existing storage depot was converted for the installation of a rotary printing press. Therefore it was inevitable to establish a deep foundation for the printing press. Additionally it was necessary modernize the fire sections as well as the heat and smoke vents for their repurposing.
At the same time a new building technology centre and a new location for the catalytic waste gas cleaning was prepared.
These works were performed during the continuous operation of sensitive printing machines.
To guarantee the logistic flows of the company there will be an additional storage depot constructed in autumn 2014.
EcoProjekt was commissioned general contractor.